posts by tags "Upstream Media cooler"

Turbine Inlet Air Cooling of two MGT80 at South-II CCPP

Turbine Inlet Air Cooling of two MGT80 at South-II CCPP

Client: MAPNA Group Plant Owner: Mobarakeh Steel co. Location: Isfahan, Iran. Project Duration: 9 Month Scheduled Commissioning Date: Aug. 2023 Scope Of Work: EPC of Upstream Media Cooling system for two MGT80 GTs, each one with nominal Power of 308MW. Status: under construction . . Keywords: Upstream Media Cooler, Upstream Evaporative cooler, Upstream system, Media Cooler, Turbine Inlet Air Cooling system […]

More ...
Upstream Inlet Air Cooling System for Rumaila Power Plant,Iraq

Upstream Inlet Air Cooling System for Rumaila Power Plant,Iraq

Client: MAPNA Group Plant Owner: Shamara Holding Location: Basra, Iraq Project Duration: 6 Month Commissioning Date: June 2023 Scope Of Work: EPC of Upstream Media Cooling system for two MGT70 GTs, each one with nominal Power of 185MW. Status: PAC Power increase: more than 18% on each GT @ design conditon . . Keywords: Upstream […]

More ...