Turbine Inlet Air Cooling of two Class-F / MGT80 units at South-II CCPP

Client: MAPNA Group
Plant Owner: Mobarakeh Steel complex co.
Location: Isfahan, Iran.
Project Duration: 9 Month
Commissioning Date: July 2025
Scope Of Work: EPC of Upstream Media Cooling system for two MGT80 GTs, each one with nominal Power of 308MW.
Status: PAC
Power increase: more than 18% on each GT @ design condition
.
.